Toton TMD, Long Eaton
Nottingham, NG10 1HA, UK
Sales: 0870 140 7630 Fax: 0870 140 8912
General Enquiries: 0870 140 7429
Background
EWS (now DB Schenker) initiated the Company Train project to provide a replacement to the company's aged inspection saloon with a modern equivalent utilising MK3 vehicles. ESG managed the complete package of concept, detail design, modification and certification. Based around a push-pull high-speed train concept, using a CL.67 locomotive with ex-WCML MkIII DVT and 3 trailer coaches, the train features a fully converted interior to adapt the train for its future use, including a board room, cinema and lounge/bar area.
System integration design
Based on our past performance in providing turnkey projects, EWS commissioned ESG to provide detailed designs, structural calculations and provide a comprehensive design scrutiny. Project management of the conference coach, DVT and locomotive conversions was also included. All this achieved within ground-breaking costs and timescales. But the real achievement has been how ESG turned into reality the concept of using the 125mph CL.67 with a DVT to provide a versatile and efficient trainset concept, that as a result has been latterly adopted by Chiltern Railways.